Location of project: Caribou Steam Plant ~ 142 Lower Lyndon Street ~ Caribou, Maine

Attached is the Request of Bids (RFB) to remove hazardous substances and/or petroleum products (HSPP) along with aboveground storage tanks (ASTs), transformers, and various types of HSPP-containing equipment in the Steam Plant.  We decided not to include removal of the 3 large transformers in this RFB since those transformers contain silicone oil (non-PCBs) and their removal from the building will have to be done concurrent with demolition.

Full Request of Bids (RFB) PDF: https://www.cariboumaine.org/wp-content/uploads/2026/03/RFB-Oil-Chemical-Removal_Caribou-Steam-Plant.pdf

Due to the large file size of the plan included in Attachment A, this plan was not included in the RFB PDF.  Attachment A can be downloaded at this link: https://spaces.hightail.com/receive/hre7MyUf17

Please see below for key dates for this project:

Key Dates

  • Questions Due: April 3, 2026, 5:00 PM
  • All bids due:  April 10, 2026, 5:00 PM
  • Notice of Award:  Week of April 13, 2026
  • Notice to proceed/mobilization: April 20, 2026
  • Final completion of work and fully demobilized: May 31, 2026